painters and decorators hertfordshire www.oaktreeltd.co have completed the top two floors of this re

  • Michael Mason
  • Dec 4, 2018
  • 1 min read

Oaktreeltd replaced the existing guttering with a cast iron replacement and prepped the existing wood work with primer and a waterproof coating, The windows were prepped in the same way and finished in 3 to 4 coatings of Farrow and Ball no 34, ( http://www.farrow-ball.com/calke-green/couleurs/farrow-ball/fcp-product/100034), After two weeks the scaffold is being taken down so that we can complete the lower floors.

As a farrow and Ball approved contractor we had the windows and woodwork cleared by our contract partner at Farrow and Ball before moving on to the next level.

www.oaktreeltd.co painters and decorators and property specialists in sg8, cb1, hertfordshire and cambridgeshire.

www.oaktreeltd.co painters and decorators sg8 sg7 sg6 sg5 cb1 cb2 cb3 cb4 herts cambs

  • Twitter Clean
  • Facebook Clean
  • White Google+ Icon

© 2023 by The Painting Company. Proudly created with Wix.com

bottom of page