This period property was refurbished in 5 weeks, sash windows repaired, new cast iron guttering. The property was washed down and had 2 coats of primer before 3 final coats od exterior parchment paint. All of the windows have been repaired and the doors prepped for a final finish. The shop front had the tiles painted and the timber posts repaired and decorated, oak tree Ltd received an award for the renovation of this listed building. Royston. sg8